How I work with a design studio

NDA first, no contact with your client, and a fixed price before you quote. This is what a build with me looks like end to end.

The same terms on every job

NDA signed first

Before designs, file access or a client’s name reach me.

No contact with your client

Questions, staging links and notes come to you, and stop there.

A fixed price, not an hourly rate

One figure for the build, confirmed before you quote.

What makes a studio hesitate before subcontracting a build

01

You quote before you know your own cost

The proposal goes to the client on a date the client chose. If the developer’s figure lands later, the difference comes out of your margin rather than out of the project.

02

The brief moves and nobody priced it

A new template, a new integration or a section redesigned after approval turns into an argument about what was always implied, usually while the work is already running.

03

Someone else talks to your client

One direct email, one name in the theme header, one screenshot in a portfolio, and the studio stops being the only party in the room.

04

The paperwork is in another country

An NDA that never comes back signed, an invoice with the wrong VAT treatment, a developer who cannot bill in GBP. The build can be fine and the file still fails at your end.

Your NDA is signed before anything moves

The agreement travels with the first enquiry and comes back signed before a single design, file share or client’s name reaches me.

Reading the brief starts after that: the artwork, how many unique templates it really holds, and the date you have already promised the client. Anything the artwork leaves ambiguous is queried in writing at that point, while an answer still costs nothing.

How a build runs after the NDA

Contact, pricing, changes and handover, in order.

01 / 04

You are the only contact your client has

Everything that would normally travel to a client comes to you instead: questions during the build, the staging link, the handover notes. What reaches them, and in whose words, stays your call.

My name is absent from the proposal, from the theme header and from my own portfolio, so a finished build points back to your studio and nowhere else.

questions during the build come to you

the staging link is yours to pass on or hold back

no name of mine in the proposal or the theme header

white label builds stay off my portfolio

02 / 04

The price is fixed before you quote your client

The price comes from the number of unique templates in the brief and how complex they are. It is one fixed figure for the whole build.

A rough figure follows as soon as I have seen the mockups, ahead of the fixed price that lands before you quote your client. You get a fixed price within 2–3 working days of receiving the design and brief.

priced from unique templates, not from page count

a fixed price within 2–3 working days

one figure for the whole build

a delivery date confirmed alongside the price

anything still open written onto the quote as an assumption

03 / 04

Changes to the brief are a separate order

The line sits at the brief. A detail the designs always implied gets absorbed without a conversation about money.

A new template, a new integration or a section redesigned after the fact is priced on its own and confirmed before it is started, so it becomes a change order your client pays for and your margin stays where it was.

details the designs always implied are absorbed

a new template or integration is priced on its own

the number reaches you before the work, never after

the change order goes to your client, not to your margin

04 / 04

The handover is yours to keep

Three things change hands: the theme, the repository, and notes in plain English for whoever maintains the site next.

Nothing in that package is licensed, keyed or wired to a service I run, so the site keeps working whether or not you ever email me again.

the theme

the repository

notes in plain English for whoever maintains the site

no licence, no key, nothing wired to a service I run

Invoicing for a UK studio

What a Polish business invoicing a UK studio looks like on paper.

Staged payments

Invoices are in GBP. A deposit is due before work starts, and on anything larger than a single template the work is split into three to five payments released as each stage of the build is delivered.

VAT reverse charged

VAT is reverse charged: as a Polish business invoicing a UK business, invoices go out without Polish VAT, and it is accounted for at your end. Your finance team will want to check that against your own registration.

What happens instead

The same four points, answered in the order they were raised.

01

The price lands before your proposal does

One fixed figure for the whole build, priced from the unique templates in the brief, with a delivery date you can put straight into your own quote. Work starts when you confirm both.

02

Changes are priced before they are started

A detail the designs always implied gets absorbed. A new template, a new integration or a section redesigned after approval is quoted on its own and confirmed first, so it becomes a change order your client pays for.

03

You are the only contact your client has

Questions during the build, the staging link and the handover notes all come to you. What reaches the client, and in whose words, stays your call.

04

The paperwork is settled before the work is

Your NDA comes back signed before a design or a client’s name reaches me. Invoices are in GBP, split into three to five stages on anything larger than a single template, with VAT reverse charged.

What a finished build looks like

Of the 300+ sites behind me, most carry somebody else’s name. These three ran the whole way through the process on this page: the agreement first, a fixed price before the client saw a number, open questions answered in writing, and a handover with nothing keyed to me. Two came through an agency and one came direct.

See all case studies

About working together

The paperwork and the boundaries, answered before the first call.

If it is a fault in code I wrote, I fix it. No time limit on that and no support contract to buy, because a build that does not do what we agreed it would do is not finished. New features and changes of mind are quoted separately.

Either of us. I can deploy to the hosting you name, or hand over the repository and let your own team take it from there. It is settled in the brief rather than on launch day, so whichever way it goes, it is in the quote you already have.

A short written agreement covering scope, price, dates and who owns the code. Your studio’s wording is fine; mine exists for studios that would rather not draft one. The code is yours on final payment, with no licence and nothing keyed.

Answers. The questions that come out of the artwork in week one need replies from you rather than from your client, and a build waiting on an answer is the only thing that moves a delivery date I have given you.

Keep reading

Ready to put a number in front of your client?

Send the designs and the date you have promised. The NDA comes back signed first, the fixed price and the delivery date before you quote.